Cloud Migration Security Advisory

Move with confidence. Pre-migration risk assessment, secure landing zone deployment, and post-migration configuration audit — for AWS, Azure, and GCP migrations.

Pre + Post Migration
End-to-End Security Coverage
AWS · Azure · GCP
All Major Cloud Platforms
Secure Landing Zone
Built Before Workloads Arrive
6 Rs Framework
Migration Strategy Aligned
Service Scope

Assess · Land · Migrate · Audit

End-to-end cloud migration security — from pre-migration workload risk assessment through secure landing zone deployment and post-migration configuration audit.

PRE-MIGRATION

Pre-Migration Risk Assessment

Assessing the security posture of your on-premises workloads before migration — application dependency mapping, data classification review, legacy vulnerability assessment, and migration risk scoring to identify which workloads are safe to move and which need remediation first.

  • Application dependency mapping and risk scoring
  • Data classification review (PII, sensitive, regulated)
  • Legacy vulnerability assessment of candidate workloads
  • Migration risk scoring and sequencing recommendation
LANDING ZONE

Secure Cloud Landing Zone Design & Deployment

Designing and deploying a secure Landing Zone before your first workload arrives — AWS Control Tower, Azure Landing Zone, or GCP Landing Zone with pre-configured SCPs, Azure Policy guardrails, centralized logging, network foundation, and identity federation.

  • Cloud account / subscription / project structure design
  • Shared security services setup (SIEM, WAF, DLP)
  • Network foundation (VPC, Hub-and-Spoke, firewalling)
  • Identity federation setup (SSO, MFA, RBAC)
MIGRATION SECURITY

Migration Execution & Post-Migration Audit

Security oversight through the migration execution phase — ensuring data is encrypted in transit, migration agents have minimal privileges, no new attack surface is created during the move, and a post-migration configuration audit validates the landed workload against the security baseline.

  • Migration wave planning and security sign-off
  • Data transfer encryption and channel security
  • Post-migration cloud configuration audit
  • Security acceptance testing and baseline validation
The Migration Security Reality

The Migration Window Is the Highest-Risk Period in Cloud Adoption

Cloud migration introduces a window of elevated security risk — migration agents with broad access, data in transit over external channels, temporary firewall rules, and the rush to meet migration deadlines. Configurations made temporarily during migration have a persistent habit of becoming permanent.

A security-first migration approach starts with the landing zone, not the first workload. We help you build the right foundation before anything moves — so every migrated workload lands in a secure, compliant, and auditable cloud environment.

The migration window is one of the highest-risk periods in cloud adoption — credentials are elevated, data moves over external channels, and temporary configurations often become permanent. 40% of cloud breaches are traced back to insecure migration configurations.
Organizations that deploy workloads before a secure landing zone is in place spend an average of 18 months remediating foundational security issues — access control, logging, and network segmentation problems that would have taken 4 weeks to build correctly from the start.
Data classification is almost always incomplete at the point of cloud migration — 70% of organizations discover regulated or sensitive data in workloads not initially flagged as sensitive during the pre-migration assessment phase.

Lift & Shift Risk

Migrating vulnerable workloads without remediation introduces pre-existing CVEs into your cloud environment.

No Landing Zone

Workloads deployed before a landing zone is built create security debt that takes 12-18 months to remediate.

Migration Agent Scope

Overly-broad migration agent credentials — common under deadline pressure — create persistent access risks.

Data Classification Gaps

70% of organizations discover sensitive data in workloads not initially flagged as sensitive before migration.

Our Process

5-Phase Cloud Migration Security

From workload discovery and landing zone deployment through wave-by-wave migration oversight and post-migration compliance audit.

01

Migration Scope & Workload Discovery

Documenting all candidate migration workloads — applications, databases, and infrastructure — including their dependencies, data classifications, current security controls, and compliance requirements. We produce a migration candidate registry with risk scores and recommended sequencing.

02

Secure Landing Zone Design & Deployment

Designing and deploying the cloud landing zone before any workload migration begins. We configure the account structure, SCPs and guardrails, centralized logging, network foundation (hub VPC / transit gateway / VNet), shared security services, and identity federation — ensuring the cloud environment is security-hardened before it receives workloads.

03

Migration Security Architecture for Each Wave

For each migration wave, defining the target architecture in the landing zone, reviewing the migration pathway security (encryption in transit, credential scoping for migration agents), and identifying any pre-migration remediation required on the source workload.

04

Migration Execution Oversight

Security review and sign-off for each migration wave — verifying that data transfer channels are encrypted, migration agent credentials are scoped to minimum required permissions, and temporary firewall or route table changes required for migration are tracked and reversed post-migration.

05

Post-Migration Audit & Compliance Validation

Post-migration configuration audit of each landed workload against the cloud security baseline — verifying encryption at rest, network access controls, IAM permissions, logging coverage, and patch status. Findings are mapped to compliance controls (SOC 2, ISO 27001, PCI-DSS) relevant to each workload.

Coverage

End-to-End Migration Security Coverage

From workload risk assessment and secure landing zone through identity federation, data transfer security, post-migration audit, and compliance mapping.

Workload Risk Assessment

Assessing each migration candidate for security risks, data sensitivity, dependency complexity, and compliance requirements — producing a risk-scored migration backlog that sequences workloads from lowest to highest risk.

Secure Landing Zone

AWS Control Tower, Azure Landing Zone, or GCP Landing Zone deployment with pre-configured SCPs, Azure Policy, or GCP Org Policies — ensuring every workload lands in a secure, compliant cloud environment from day one.

Identity Federation

Configuring federated identity from the enterprise IdP (Entra ID, Okta) to the target cloud platform — enabling SSO, MFA enforcement, and least-privilege RBAC for all landing zone resources before the first workload arrives.

Data Transfer Security

Reviewing and configuring the security of data transfer channels — AWS DataSync, Azure Data Factory, Database Migration Service — ensuring data is encrypted in transit with strong protocols and transfer credentials are minimally privileged.

Post-Migration Audit

Configuration audit of each migrated workload against the cloud security baseline — encryption at rest, security group / NSG rules, IAM permissions review, CloudTrail / Activity Log coverage, and patch status verification.

Compliance Mapping

Mapping post-migration configuration findings to compliance controls (SOC 2 Type II, ISO 27001, PCI-DSS, HIPAA) — producing audit evidence that demonstrates the migrated workload meets its compliance requirements in the new cloud environment.

Why Adayptus

Land Before You Launch — Every Time

We design the secure foundation before the first workload moves. Security-first migration means every workload lands in a hardened environment — not a cloud account that was set up in a hurry.

Land Before You Launch

We design and deploy the secure landing zone before any workload migration begins — not in parallel with the first wave. This prevents the 18-month remediation cycle that follows cloud migrations done in the wrong order.

Risk-Sequenced Migration

Our pre-migration risk assessment produces a sequenced migration backlog that moves lower-risk workloads first — validating landing zone security with non-critical assets before migrating regulated and sensitive data.

Migration Window Security

The migration window introduces temporary elevated credentials, open firewall rules, and data in transit — all of which are high-value attack targets. We maintain security oversight through the entire execution phase, not just before and after.

Compliance-Integrated

Migration security is designed with the end-state compliance requirements in mind from day one — SOC 2, ISO 27001, PCI-DSS, and HIPAA controls are built into the landing zone and post-migration audit, not added after the fact.

Migration Technologies We Support

AWS Control Tower
Azure Landing Zone
GCP Landing Zone
AWS DataSync
Azure Data Factory
AWS Database Migration Service
Terraform
Microsoft Defender for Cloud
FAQs

Frequently Asked Questions

Everything you need to know about cloud migration security

Get Started

Migrate to Cloud Without Migrating the Risk

Cloud migration is a once-in-a-generation opportunity to build security into the foundation. Let's make sure you take it — with a secure landing zone, risk-sequenced migration, and complete post-migration audit.

Get in Touch

Ready to secure your future? Reach out to us for a consultation.